Cedar City Regional Hospital — Essential Electrical Upgrade
- Client
- Intermountain Health
- General contractor
- Layton Construction
- Architect
- MHTN Architects
- Location
- Cedar City, UT
Essential electrical system upgrade for Iron County's primary hospital, including dual standby generators, OR isolated power, and life-safety branch reconfiguration — all delivered through an occupied facility with zero impact to patient care.
Scope
- NFPA 99 Type 1 essential electrical system upgrade
- Dual 1,250kW standby generators with paralleling switchgear
- OR isolated power panels (IPPs) for two new surgical suites
- Code blue, nurse call, and patient monitoring rough-in
- Coordinated install through occupied facility — zero patient downtime
Highlights
- Largest healthcare electrical project in Iron County in 2025
- Dual standby tested at full hospital load on first attempt
- All life-safety branches certified on first AHJ inspection